Large-Format Thermoplastic Composite AFP Systems
Imported AFP equipment costs >50% of composite part production in aerospace.
High energy consumption of autoclaves.
TKS MAX (6m x 3m work area) for rapid large-part manufacturing;
laser primary heat source (high power) enabling autoclave-free in-situ consolidation.
50% lower cost for structures (wings/beams/panels/trusses);
Placement speed up to 15m/min.